Siirry pääsisältöön

Julkaisuhaku henkilölle Fabricio Oliveira

Takaisin Henkilökohtaiselle sivulle

Julkaisut

3000

P[BOL18a]N. Boland, J. Christiansen, B. Dandurand, A. Eberhard, F. Oliveira: A parallelizable augmented Lagrangian method applied to large-scale non-convex-constrained optimization problems Mathematical Programming (Avaa julkaisijan sivulla)
P[OLI18]F. Oliveira, J. Christiansen, B. Dandurand, A. Eberhard: Combining penalty based and Gauss-Seidel methods for solving stochastic mixed integer problems International Transactions in Operational Research (Avaa julkaisijan sivulla)

2018

P[BOL18b]N. Boland, J. Christiansen, B. Dandurand, A. Eberhard, J. Linderoth, J. Luedtke, F. Oliveira: Combining Progressive Hedging with a Frank--Wolfe Method to Compute Lagrangian Dual Bounds in Stochastic Mixed-Integer Programming SIAM Journal on Optimization, Vol. 28 (2), 2018, pp. 1312-1336 (Avaa julkaisijan sivulla)
P[PER18]M.A. Fernández Pérez, F. Oliveira, S. Hamacher: Optimizing workover rig fleet sizing and scheduling using deterministic and stochastic programming models Industrial and Engineering Chemistry Research, Vol. 57 (22), 2018, pp. 7544-7554 (Avaa julkaisijan sivulla)

2017

P[CAR17]A.N. Carvalho, L.F. Scavarda, F. Oliveira: An optimisation approach for capacity planning: modelling insights and empirical findings from a tactical perspective Production, 27, 2017, e20170014 (Avaa julkaisijan sivulla)
P[CON17]L.D. Condeixa, A. Leiras, F. Oliveira, I. de Brito Jr: Disaster relief supply pre-positioning optimization: A risk analysis via shortage mitigation International Journal of Disaster Risk Reduction, Vol. 25, 2017, pp. 238-247 (Avaa julkaisijan sivulla)
P[CUN17a]P. Cunha, F. Raupp, F. Oliveira: Periodic review system for inventory replenishment control for a two-echelon logistics network under demand uncertainty: a two-stage stochastic programming approach Pesquisa Operacional, Vol. 37 (2), 2017, pp. 247-276 (Avaa julkaisijan sivulla)
P[CUN17b]P. Cunha, F. Raupp, F. Oliveira: A two-stage stochastic programming model for periodic replenishment control system under demand uncertainty Computers and Industrial Engineering, Vol. 107, 2017, pp. 313-326 (Avaa julkaisijan sivulla)
P[DILL17]M. Dillon, F. Oliveira, and B. Abbasi: A two-stage stochastic programming model for inventory management in the blood supply chain Int. J. Production Economics, 187, pp. 27-41 (Avaa julkaisijan sivulla)
P[DIZ17]G. Diz, F. Oliveira, S. Hamacher: Improving maritime inventory routing: application to a Brazilian petroleum case Maritime Policy & Management, Vol. 44 (1), 2017, pp. 42-61 (Avaa julkaisijan sivulla)